PREPARATION OF CONCEPTUAL MASTER PLAN TO MITIGATE FLOODS IN NORTH GUJARAT
North Gujarat experienced severe flooding in 2015 and 2017. Further to this, the work of preparing conceptual master plan to mitigate floods in North Gujarat is entrusted to SECON Pvt. Ltd in 2017.
The scope of work includes:
DEVELOPING A REAL TIME FLOOD FORECASTING SYSTEM AND WEB-BASED DECISION SUPPORT SYSTEM FOR THE CHENNAI CITY AND ITS NEIGHBORHOOD
The Chennai city and its suburb experienced major flooding in 1943, 1976, 1985, 1996, 2002, 2005, and 2015 with 2015 event being the most severe of all (US$2.2 billion. Subsequently, SECON have been appointed to equip the State Emergency Operation Centre, Chennai, Greater Chennai Corporation and 10 surrounding Urban Local Bodies (ULB) by Planning, setting up and Operationalizing a Real Time Flood Forecasting and Spatial Decision Support System in the four basins namely Cooum (489.32 Sq.km), Adyar (1,162.46 Sq.km), Kosasthalayar (3,850 Sq.km) and Kovalam (472.75 Sq.km
The scope of work includes: